Our Tunnel Team at work

Our tunnel team – at work on the All Hands Saturday morning. It was great weather for dressing a skeleton. And thanks to work share Jola for the pictures.

The follow up team has fitted one small door. Ian our grower and volunteer Chas have plans in hand to fit the necessary guttering and ventilation. That will just leave the remaining two doors to fit. There’s a lot more to fitting up a working poly tunnel than just putting up the frame and adding the big cover isn’t there?

Poly tunnel building team Poly tunnel building team Poly tunnel building team